Covered cooking and service area
Live cooking needs to sit under solid cover: an indoor amenity room, a private dining room, a covered terrace, or a rooftop area with a permanent roof or an approved temporary cover. Uncovered terrace decking is the most common reason a station has to be repositioned on the day.
Venue-approved power
Confirm with the building which outlets or circuits at the station position may be used for catering equipment, and whether engineering needs to sign off first. Actual power requirements for the station are stated in the proposal rather than assumed on site, and generators are rarely an option in a tower.
Load-in path
Map the route from the loading dock or drop-off to the room: dock booking, service elevator dimensions and reservation window, corridor turns, thresholds, and distance from the elevator lobby. In Brickell the load-in window usually drives the schedule more than the cooking does.
Guest queue and flow
Leave space for guests to line up without blocking the bar, the elevator lobby, restrooms or a dance floor. In a fixed amenity room, plan the approach from one side and the exit from the other so the line keeps moving.
Service timing
The package includes two hours of live-chef service. Fix the start time against the run of show so the station is not opened during toasts, a presentation or a program block, and confirm any change to that window in writing.
Building and venue approval
Associations, property managers and hotel venues may restrict onsite cooking, open flame, equipment placement, sprinkler-covered areas or vendor hours. Get written confirmation that a live cooking station is permitted in the intended position before the layout is locked.
Weather fallback
Rooftop and terrace positions need an alternate. South Florida heat, wind at height and afternoon storms are planning inputs, not surprises: identify an indoor or covered alternate position and agree in advance who makes the call and by when.
Coordination
Share the floor plan, timeline, building contact and any vendor requirements early so the station position, power and service window are settled before the final proposal. Contact the team with the details you already have.