Covered cooking and service area
Live cooking needs to sit under solid cover: a roof, a covered terrace, a lanai, or a tent approved for the location. On rooftops and pool decks, also check how exposed the position is to wind and sun, since an open corner that looks fine at a walkthrough can be the reason the station has to be repositioned on the day.
Venue-approved safe power
Confirm with the venue or building engineer what power is available at the intended station position and whether it may be used for catering equipment. Actual power requirements for the station are stated in the proposal rather than assumed on site, and generators may trigger additional review at City and public locations.
Causeway and building load-in
Map the route end to end: causeway timing into the island, where the truck can legally stop, whether a loading dock or service entrance must be reserved, freight elevator windows, and the distance from the drop-off point to the station. Restricted access is normal here and mainly affects timing, so flag it before the event date rather than on it.
Guest queue and flow
Leave space for guests to line up without blocking the bar, walkways, elevators, restrooms or the dance floor. In narrower rooftop and terrace layouts, plan the approach from one side and the exit from the other so the line keeps moving.
Service window
The package includes two hours of live-chef service. Fix the start time against the run of show so the station is not opened during toasts or a program block, and confirm any change to that window in writing. Where a venue block includes setup and breakdown, work backward from that total before committing to a start time.
Venue and building approval
Hotels, condos and clubs may restrict onsite cooking, equipment placement, vendor load-in hours or decoration, and many require vendor paperwork such as certificates of insurance in advance. Get written confirmation that a live cooking station is permitted in the intended position, and ask what documents the building needs and by when.
Weather contingency
Heat, sea breeze and afternoon storms are planning inputs, not surprises. Identify an indoor or covered alternate position for the station, and agree in advance who makes the call to move it and by what time.
Coordination
Share the floor plan, timeline, building contact and venue rules early so the station position, power and service window are settled before the final proposal. Contact the team with the details you already have.